Skip to main content
Skip to main content
Product title:

Hearthstone Castleton Baffle Kit (15'' x 10-1⁄2'' x 1⁄2''): 2432A

Product rating:
Product price:
$79.99
Product SKU ! 2432A
Product MPN ! 90-7630
Product availability: In Stock
Bullet point features

Description

Hearthstone Wood Stove Baffle Kit (Castleton).  The baffle board helps by holding heat in the firebox, causing the reburn tubes to reach extremely high temperatures.  It also stops the flue gases from quickly exiting the stove and forces them to travel across the tubes allowing reburn to take place. 

 

 Kit Includes: (1) Baffle Board Part 3120-330, (1) Bracket Part 5021-066, and 2 Cotter Pins.

 


Replacement For Part Number:

  • 90-7630

Compatible Models

    Hearthstone

  • Castleton

Technical Specs

Dimensions 15'' x 10-1/2'' x-1/2''

Videos

Instructions

Install Instructions For Hearthstone Castleton Baffle Kit (15'' x 10-1⁄2'' x 1⁄2''): 2432A

Baffle Replacement Instructions:

1) Note the placement of the cotter pins that hold the baffle to the middle secondary air pipe (this will be important when installing the new baffle). Using the pliers, straighten the pins and remove them.

2) The original baffle is now loose. Remove the damaged baffle from the firebox. Note: There may be fly ash and other debris on top of the baffle, use care when removing the damaged piece (s). Lift the back end of the baffle up so that the front edge of the baffle clears the front air pipe. It can now be pulled down between the first and second air pipes. Pull it completely out of the stove. Discard the used baffle.

3) Place the new baffle in the firebox with the stainless-steel bracket on the top of the baffle. Position the indented edge of the baffle down and toward the front of the firebox. This will rest on the baffle support on the front burner tube.

4) Slide the back end of the new baffle up between the first and second air pipes with the bracket on top of it. Position it so that the front edge of the baffle sits flush against the front support.

5) Work the cotter pins down through the bracket, baffle, and the middle air tube – in the same location where they were removed from the original baffle. Once they drop through all three pieces, twist the ends with the pliers to keep them in place. 

Troubleshooting

Helpful Tips:

It is important to inspect the baffle board on a regular basis. Missing pieces or cracks in the baffle may reduce how effectively the reburn system works. If you notice signs of deterioration as previously mentioned the board should be replaced.


Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Information

This Item Qualifies For Free Shipping With Orders Over $199!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $199 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package from us. We do not offer expedited shipping of any kind to Canada. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information
Jump back to product information tab navigation

Description

Hearthstone Wood Stove Baffle Kit (Castleton).  The baffle board helps by holding heat in the firebox, causing the reburn tubes to reach extremely high temperatures.  It also stops the flue gases from quickly exiting the stove and forces them to travel across the tubes allowing reburn to take place. 

 

 Kit Includes: (1) Baffle Board Part 3120-330, (1) Bracket Part 5021-066, and 2 Cotter Pins.

 


Replacement For Part Number:

  • 90-7630

Technical Specs

Dimensions 15'' x 10-1/2'' x-1/2''

Instructions

Assembly Instructions For Hearthstone Castleton Baffle Kit (15'' x 10-1⁄2'' x 1⁄2''): 2432A

Baffle Replacement Instructions:

1) Note the placement of the cotter pins that hold the baffle to the middle secondary air pipe (this will be important when installing the new baffle). Using the pliers, straighten the pins and remove them.

2) The original baffle is now loose. Remove the damaged baffle from the firebox. Note: There may be fly ash and other debris on top of the baffle, use care when removing the damaged piece (s). Lift the back end of the baffle up so that the front edge of the baffle clears the front air pipe. It can now be pulled down between the first and second air pipes. Pull it completely out of the stove. Discard the used baffle.

3) Place the new baffle in the firebox with the stainless-steel bracket on the top of the baffle. Position the indented edge of the baffle down and toward the front of the firebox. This will rest on the baffle support on the front burner tube.

4) Slide the back end of the new baffle up between the first and second air pipes with the bracket on top of it. Position it so that the front edge of the baffle sits flush against the front support.

5) Work the cotter pins down through the bracket, baffle, and the middle air tube – in the same location where they were removed from the original baffle. Once they drop through all three pieces, twist the ends with the pliers to keep them in place. 

Troubleshooting

Helpful Tips:

It is important to inspect the baffle board on a regular basis. Missing pieces or cracks in the baffle may reduce how effectively the reburn system works. If you notice signs of deterioration as previously mentioned the board should be replaced.


Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Info

This Item Qualifies For Free Shipping With Orders Over $199!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $199 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package from us. We do not offer expedited shipping of any kind to Canada. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information

Customer Reviews

Based on 1 review
100%
(1)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
E
EDWARD L.

Quick Service

QUESTIONS & ANSWERS

If your question does not concern this specific product, use our contact form

Have a Question?

Be the first to ask a question about this.

Ask a Question

Customer Reviews

Based on 1 review
100%
(1)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
E
EDWARD L.

Quick Service