Skip to main content
Skip to main content
Product title:

US Stove Multi-Fuel Furnace (Long Lead) Thermistor: 80501

Product rating:
Product price:
Save 51%
Original Price $79.99
Current Price $38.99
Product SKU ! 80501
Product MPN ! 80501
Product availability: In Stock
Bullet point features
Buy Now Pay Later

Description

US Stove Multi-Fuel Furnace (Long Lead) Thermistor: 80501. This temperature sensor connects to your furnace plenum. When the plenum reaches a set temperature, it triggers the distribution fans to activate. If your distribution blowers aren't turning on when they should, the thermistor may need to be replaced.


Replacement For Part Number:

  • 80501

UPC: 012685805016

Compatible Models

Technical Specs

Length (in) 46"
Wire Connector Notes 3-Pin Molded Plug / Ring Terminal
Wire Length 46"

Instructions

Install Instructions For US Stove Multi-Fuel Furnace (Long Lead) Thermistor: 80501

This sensor typically mounts to the rear of the unit and will plug directly into the circuit board (Make sure the unit is unplugged prior to replacing the sensor).

Troubleshooting

Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Information

This Item Qualifies For Free Shipping With Orders Over $99!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $99 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package. Please note, we are unable to track US Postal packages once they cross the US border and cannot guarantee shipping times. All customs fees incurred are the responsibility of the customer and are not included in the total price. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information
Jump back to product information tab navigation

Description

US Stove Multi-Fuel Furnace (Long Lead) Thermistor: 80501. This temperature sensor connects to your furnace plenum. When the plenum reaches a set temperature, it triggers the distribution fans to activate. If your distribution blowers aren't turning on when they should, the thermistor may need to be replaced.


Replacement For Part Number:

  • 80501

UPC: 012685805016

Technical Specs

Length (in) 46"
Wire Connector Notes 3-Pin Molded Plug / Ring Terminal
Wire Length 46"

Instructions

Install Instructions For US Stove Multi-Fuel Furnace (Long Lead) Thermistor: 80501

This sensor typically mounts to the rear of the unit and will plug directly into the circuit board (Make sure the unit is unplugged prior to replacing the sensor).

Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Info

This Item Qualifies For Free Shipping With Orders Over $99!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $99 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package. Please note, we are unable to track US Postal packages once they cross the US border and cannot guarantee shipping times. All customs fees incurred are the responsibility of the customer and are not included in the total price. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

QUESTIONS & ANSWERS

If your question does not concern this specific product, use our contact form

Have a Question?

Be the first to ask a question about this.

Ask a Question

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)