Skip to main content
Skip to main content
Product title:

Baffle Board (18-1/2" x 12" x 1/2") For Wood Stoves & Fireplaces

Product rating:
Product price:
$109.99
Product SKU ! BAFFLE-BOARD-28
Product availability: In Stock
Bullet point features

Description

Replacement Baffle Board for many Wood Stoves and Fireplaces. It measures 11" long x 9.25" wide x 0.5" thick. If the board is deteriorated or you notice large cracks forming it should be replaced. You should not burn your stove without a functional baffle board in place! Please check your manual for compatibility, many sizes are available, see more sizes here.

Technical Specs

Length 18 1/2"
Width 12"
Height 1/2"

Instructions

Install Instructions For Baffle Board (18-1/2" x 12" x 1/2") For Wood Stoves & Fireplaces

Install Instructions Part # 3120-202:

1.) Before starting the disassembly, use a magic marker to identify the position of the secondary air tubes at the top of the firebox, just below the ceramic baffle (Mark them from the front to the back in a manner that you will recognize for reassembly).

2.) Locate the cotter pin on the left side of the third pipe from the front. Use the needle-nose pliers to remove the cotter pin.

3.) The air pipes are now free, and by moving them slightly to the left they will clear the edge of the manifold. The secondary air pipe retainer plate on the right side of the manifold is now also loose and can be taken down.

4.) The original ceramic board should now be loose and can be dropped into the firebox. Remove it along with the ceramic blanket on the top of the board. Save the blanket for reassembly (If any dried stove cement is present on the edges of the manifold, scrape it away now).

5.) Apply a few dabs of fresh stove cement or gasket glue (water glass) onto the top of the new baffle board to keep the blanket in place during reassembly. Ensure that the blanket does not overlap the edges of the board. Trim any excess portion of the blanket before installing the baffle board.

6.) Place the new board and blanket into the firebox and lift it above the secondary air manifold and allow it to rest on the back, and one side of the manifold.

7.) With the baffle in this position, install the air pipes. First place the retainer back into the manifold on the right side with the front slipped into the bracket and the tang inserted into the hole in the side of the manifold.

8.) Replace the tubes starting in the rear. Slide the left edge of each individual tube into the corresponding hole in the left edge of the manifold. Position the tube so that the slot on the right side of the pipe drops over the upper edge of the retaining bracket. Lock the tubes in place by inserting and bending the cotter pin back into the hole in the third pipe from the back.

9.) Reach up through the pipes and slide the baffle board toward the center, it will drop into its proper place above the secondary air tubes (*NOTE: The dried stove cement present was used to hold the ceramic baffle board in place during shipping and installation*). Once the stove is installed permanently, new cement is not needed for the new baffle board.

Troubleshooting

Helpful Tips:

It is important to inspect the baffle board on a regular basis. Missing pieces or cracks in the baffle may reduce how effectively the reburn system works. If you notice signs of deterioration as previously mentioned the board should be replaced.


Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Information

This Item Qualifies For Free Shipping With Orders Over $99!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $99 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package from us. We do not offer expedited shipping of any kind to Canada. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information
Jump back to product information tab navigation

Description

Replacement Baffle Board for many Wood Stoves and Fireplaces. It measures 11" long x 9.25" wide x 0.5" thick. If the board is deteriorated or you notice large cracks forming it should be replaced. You should not burn your stove without a functional baffle board in place! Please check your manual for compatibility, many sizes are available, see more sizes here.

Technical Specs

Length 18 1/2"
Width 12"
Height 1/2"

Instructions

Install Instructions For Baffle Board (18-1/2" x 12" x 1/2") For Wood Stoves & Fireplaces

Install Instructions Part # 3120-202:

1.) Before starting the disassembly, use a magic marker to identify the position of the secondary air tubes at the top of the firebox, just below the ceramic baffle (Mark them from the front to the back in a manner that you will recognize for reassembly).

2.) Locate the cotter pin on the left side of the third pipe from the front. Use the needle-nose pliers to remove the cotter pin.

3.) The air pipes are now free, and by moving them slightly to the left they will clear the edge of the manifold. The secondary air pipe retainer plate on the right side of the manifold is now also loose and can be taken down.

4.) The original ceramic board should now be loose and can be dropped into the firebox. Remove it along with the ceramic blanket on the top of the board. Save the blanket for reassembly (If any dried stove cement is present on the edges of the manifold, scrape it away now).

5.) Apply a few dabs of fresh stove cement or gasket glue (water glass) onto the top of the new baffle board to keep the blanket in place during reassembly. Ensure that the blanket does not overlap the edges of the board. Trim any excess portion of the blanket before installing the baffle board.

6.) Place the new board and blanket into the firebox and lift it above the secondary air manifold and allow it to rest on the back, and one side of the manifold.

7.) With the baffle in this position, install the air pipes. First place the retainer back into the manifold on the right side with the front slipped into the bracket and the tang inserted into the hole in the side of the manifold.

8.) Replace the tubes starting in the rear. Slide the left edge of each individual tube into the corresponding hole in the left edge of the manifold. Position the tube so that the slot on the right side of the pipe drops over the upper edge of the retaining bracket. Lock the tubes in place by inserting and bending the cotter pin back into the hole in the third pipe from the back.

9.) Reach up through the pipes and slide the baffle board toward the center, it will drop into its proper place above the secondary air tubes (*NOTE: The dried stove cement present was used to hold the ceramic baffle board in place during shipping and installation*). Once the stove is installed permanently, new cement is not needed for the new baffle board.

Troubleshooting

Helpful Tips:

It is important to inspect the baffle board on a regular basis. Missing pieces or cracks in the baffle may reduce how effectively the reburn system works. If you notice signs of deterioration as previously mentioned the board should be replaced.


Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for these parts may take up to 4 weeks for processing, and customers must cover shipping.

Shipping Info

This Item Qualifies For Free Shipping With Orders Over $99!

When Will My Order Ship?

All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.

Do You Offer Express Shipping?

Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.

How Does Free Shipping Work?

Most orders over $99 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.

Do You Ship To Canada?

We ship to Canada! We estimate USPS to take 4-10 days once receiving your package from us. We do not offer expedited shipping of any kind to Canada. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.

Do You Ship To Alaska Or Hawaii?

We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.

Do You Ship Outside The US Or Canada?

Unfortunately, at this time we do not offer international shipping other than to Canada.

Shipping Time Estimations

For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.

Learn More About Our Shipping Information

Customer Reviews

Based on 6 reviews
100%
(6)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
C
Christina B.
Hearthstone Manchester / Mansfield Baffle Board (18-1⁄2'' x 12'' x 1⁄2''): 3120-202-AMP

Package arrived intact. This is the second one we have bought within 3 years. Price stayed within reason from previous years. We also bought the insulation blacket. Very pleased with this company and their timely response in full filling the order.

P
Peter A.
Perfect

Items just as described and a perfect fit. Plus quick shipping

M
Mike W.
Parts for my Mansfield wood stove

The parts arrived promptly and in great shape. Just what was needed. Got them in and the stove is working great again. Thank you.

C
Chad G.
Very pleased

Very pleased.Accurate description and fast shipping.

D
Dale M.
Review

Received everything sooner than expected.
Everything was packaged well and received that I ordered in good condition.

QUESTIONS & ANSWERS

If your question does not concern this specific product, use our contact form

Have a Question?

Be the first to ask a question about this.

Ask a Question

Customer Reviews

Based on 6 reviews
100%
(6)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
C
Christina B.
Hearthstone Manchester / Mansfield Baffle Board (18-1⁄2'' x 12'' x 1⁄2''): 3120-202-AMP

Package arrived intact. This is the second one we have bought within 3 years. Price stayed within reason from previous years. We also bought the insulation blacket. Very pleased with this company and their timely response in full filling the order.

P
Peter A.
Perfect

Items just as described and a perfect fit. Plus quick shipping

M
Mike W.
Parts for my Mansfield wood stove

The parts arrived promptly and in great shape. Just what was needed. Got them in and the stove is working great again. Thank you.

C
Chad G.
Very pleased

Very pleased.Accurate description and fast shipping.

D
Dale M.
Review

Received everything sooner than expected.
Everything was packaged well and received that I ordered in good condition.

Liquid error (layout/theme line 255): Could not find asset snippets/iStock-notify-me.liquid