Skip to main content
Flash Sale Live [ UP TO 25% OFF SITE WIDE! ] No Discount Code Necessary Free shipping on orders over $99* 90-Day Warranty Included
Product title:

Breckwell Multi-Fuel Furnace (Long Lead) Thermistor: 80501-AMP

Product rating:
Product price:
Save 25%
Original Price $19.99
Current Price $14.99

$45.00 less than the OEM

Product SKU ! 80501(BRE)-AMP
Product MPN ! 80501
Product availability: In Stock
Bullet point features

Pay over time with Affirm.

Description

Breckwell Multi-Fuel Furnace (Long Lead) Thermistor: 80501. This temperature sensor connects to your furnace plenum. When the plenum reaches a set temperature, it triggers the distribution fans to activate. If your distribution blowers aren't turning on when they should, the thermistor may need to be replaced.

Wire Length (46")

UPC: 012685805016

Replacement For Part Number:

  • 80501

Compatible Models

Breckwell

Please refer to your owners manual and model information. Where To Find Your Make & Model

Technical Specs

Check these against the part you are replacing before ordering. If a dimension does not match, contact us and we will confirm the fit.

Length (in) 1 ⁵⁄₁₆"
Width (in) ¼"
Height (in) ³⁄₁₆"
Wire Connectors Molex - 3 Pin
Wire Length 46"
Weight 0.50 oz

Instructions

Install Instructions For Breckwell Multi-Fuel Furnace (Long Lead) Thermistor: 80501-AMP

Instructional Notes

This sensor typically mounts to the rear of the unit and will plug directly into the circuit board (Make sure the unit is unplugged prior to replacing the sensor).

Customers Also Bought

Parts that customers who bought this one also ordered, the most popular first.

  • SKU
    MPN
    88123(BRE)
    88123
    $8.99
    $11.99
    Breckwell Pellet Stove Exhaust Blower Housing Gasket: 88123

    Breckwell Pellet Stove Exhaust Blower Housing Gasket: 88123

  • SKU
    MPN
    891455-AND-40501-COMBO-AMP(BRE)
    891455
    $97.49
    $129.99
    Breckwell Burn Pot & Auger Shaft Combo: 891455-AND-40501-COMBO-AMP(BRE)

    Breckwell Burn Pot & Auger Shaft Combo: 891455-AND-40501-COMBO-AMP(BRE)

    Steel/Cast Iron
  • SKU
    MPN
    80495(BRE)-AMP
    80495
    $149.99
    $199.99
    Breckwell (Multi-Fuel) Furnace Exhaust Blower Assembly: 80495-AMP

    Breckwell (Multi-Fuel) Furnace Exhaust Blower Assembly: 80495-AMP

    Dimensions 1/4'' x 1 13/16'' 120V
  • SKU
    MPN
    SPFL-465-OIL
    PP5400
    $14.99
    $19.99
    Stove Parts For Less Synthetic Bearing Oil

    Stove Parts For Less Synthetic Bearing Oil

    1.7 fl. oz / 50 ml Replaces PP5400
  • SKU
    MPN
    80529(BRE)-AMP
    80529
    $67.49
    $89.99
    Breckwell Pellet (Stove/Furnace) Auger Motor (4PRM CCW): 80529-AMP

    Breckwell Pellet (Stove/Furnace) Auger Motor (4PRM CCW): 80529-AMP

    4RPM CCW 4 RPM CCW
  • SKU
    MPN
    891132 (BRE)
    891132
    $5.99
    $7.99
    Breckwell Pellet Stove Brass Bushing (Agitator/Stirrer): 891132

    Breckwell Pellet Stove Brass Bushing (Agitator/Stirrer): 891132

    Brass
  • SKU
    MPN
    80600P (BRE) AMP
    80600P
    $224.99
    $299.99
    Breckwell Wood/Coal Furnace (800 CFM) Distribution Blower: 80600P-AMP

    Breckwell Wood/Coal Furnace (800 CFM) Distribution Blower: 80600P-AMP

    115V / 2.5/3.0A 1270/1350 RPM
  • SKU
    MPN
    80461 (BRE)
    80461
    $13.49
    $17.99
    Breckwell (Wood/Pellet) Stove Power Supply Cord: 80461

    Breckwell (Wood/Pellet) Stove Power Supply Cord: 80461

  • SKU
    MPN
    891455-(BRE)-AMP
    891455
    $74.99
    $99.99
    Breckwell Burnpot Weldment: 891455-AMP

    Breckwell Burnpot Weldment: 891455-AMP

    Steel
  • SKU
    MPN
    88127 (BRE)
    88127
    $7.49
    $9.99
    Breckwell (Wood/Coal) Furnace Convection Blower Gasket: 88127

    Breckwell (Wood/Coal) Furnace Convection Blower Gasket: 88127

    Dimensions 5 5/8" x 9 3/8"
  • SKU
    MPN
    88066 (BRE)
    88066
    $22.49
    $29.99
    Breckwell (Wood/Pellet) Stove Rope Door Gasket (5/8" x 7'): 88066

    Breckwell (Wood/Pellet) Stove Rope Door Gasket (5/8" x 7'): 88066

    5/8" x 7' Fiberglass
  • SKU
    MPN
    83534 (BRE)
    83534
    $2.24
    $2.99
    Breckwell Pellet Stove Bushing Retaining Ring: 83534

    Breckwell Pellet Stove Bushing Retaining Ring: 83534

Warranty

Unfortunately, sometimes products do not work like they are supposed to. We offer a 90 day warranty on manufacturer defects. Some manufacturers make this a very simple and easy process unfortunately others do not. Items must be used in accordance with the manufacturers guidelines to qualify for warranty replacement. Please be advised that warranty claims for special parts may take up to 4 weeks for processing, and customers are responsible for return shipping charges.

Shipping Information

This Item Qualifies For Free Shipping With Orders Over $99!

When Will My Order Ship?
All orders are typically processed within 24 hours of receiving payment and are shipped from us same day if placed before our shipping cutoff time (Monday - Friday: 12PM, Saturday: 10AM, Sunday: No Shipping), orders placed after our cutoff time are shipped the next morning.
Do You Offer Express Shipping?
Yes! Please note the shipping times are based on business days, weekends and holidays do not count to the delivery date. Please see our expedited ship time schedules here.
How Does Free Shipping Work?
Most orders over $99 qualify for free shipping! Orders which ship for free are shipped with either USPS or UPS based on our discretion. If you are using a PO box, free shipping orders will always go USPS.
Do You Ship To Canada?
We ship to Canada! We estimate USPS to take 4-10 days once receiving your package. Please note, we are unable to track US Postal packages once they cross the US border and cannot guarantee shipping times. All customs fees incurred are the responsibility of the customer and are not included in the total price. Please allow an extra 2-5 days for all shipments to Canada. Free shipping is not available to Canada.
Do You Ship To Alaska Or Hawaii?
We ship to both Alaska and Hawaii! We do not offer next day or two day shipping to Alaska or Hawaii. Free shipping is not available to Alaska or Hawaii.
Do You Ship Outside The US Or Canada?
Unfortunately, at this time we do not offer international shipping other than to Canada.
Shipping Time Estimations
For information on shipping time estimations, see the Shipping Information & Transit Times on the shipping page.
Learn More About Our Shipping Information

Questions & Answers

If your question does not concern this part, contact us directly or read our FAQs.

No one has asked about this part yet. Ask us anything specific to it - the wattage, which style or model year it suits, what part numbers it replaces - and we will answer it ourselves.

Every question is read by our team before it appears here, so it will not show up right away - we will email you the answer.

Customer Reviews

Based on 2 reviews
100%
(2)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
s
steve w.

USSC US Stove Long Lead Thermistor for 6100, 6300, 6500 & 6220, #80501-AMP

D
Dk S.
Fast shipping

Got the parts as described. Thank you

Still have a question?

Call or email us and we will help you find the right part.

Mon–Sat 9AM–5PM · Sun 10AM–3PM ESTShipping policy · Return policy · FAQs

Customer Reviews

Based on 2 reviews
100%
(2)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
s
steve w.

USSC US Stove Long Lead Thermistor for 6100, 6300, 6500 & 6220, #80501-AMP

D
Dk S.
Fast shipping

Got the parts as described. Thank you