Install Instructions For Blaze King Wood Stove Door Handle Assembly (CK20.1 & CK20.2): Z2544.S.B
Instructional Notes
Install Instructions:
1.) Locate the handle.
2.) On some units, the handle will be secured by a set screw or pin that will need to be removed. On others, the handle will be threaded onto the rod (If threaded, you will have to rotate the handle in a counterclockwise motion to unthread before removing it. Pay attention to the orientation of the handle prior to removal).
3.) Install the new handle by threading it onto the rod. If your handle has a set screw: position the handle and tighten the set screw (Make sure the handle is set in the correct orientation to allow for proper operation).